Collection kits arrive first
Accountable handover: Kit supplier / site receiver
Confirm collection tubes, specimen labels, kit count and pre-visit delivery window.
Evidence to verify: Kit list, lot/expiry where relevant, delivery proof

Planning and coordination of time-sensitive investigational medicinal product movements between research participants and logistics touchpoints.
Private staging • content and permissions pending final verificationA temperature-sensitive shipment starts with validated handling requirements and clear responsibilities. Scope and availability are confirmed individually.

Two inbound flows converge at the research site. After collection, testing and backup specimens follow different approved destinations. Every handover requires its own evidence.
Accountable handover: Kit supplier / site receiver
Confirm collection tubes, specimen labels, kit count and pre-visit delivery window.
Evidence to verify: Kit list, lot/expiry where relevant, delivery proof
Accountable handover: Authorized depot / sponsor supply team / carrier
Agree product release authorization, permitted temperature band, qualified packaging and dispatch handovers.
Evidence to verify: Release instruction, packing evidence, temperature plan, custody records
Accountable handover: Site pharmacy / authorized research team
Reconcile kit receipt and investigational product stock under the study-approved process; segregate any exception.
Evidence to verify: Receipt, inventory/accountability, temperature data review and discrepancy record
Accountable handover: Site sender / verified courier / receiving laboratory
Confirm sample type, permitted packaging, pickup timing and receiving accession against the lab manual.
Evidence to verify: De-identified tube ID, custody timestamps, receiving confirmation
Accountable handover: Site sender / qualified storage operator
Confirm storage authorization, required temperature, retention terms and backup-to-bank handover.
Evidence to verify: Container and custody log, storage intake receipt, approved retention specification
Accountable handover: Sponsor / CRO project team / site / quality owners
Reconcile dispatch, delivery, temperature exceptions and destination receipts without transferring personal medical data through this public site.
Evidence to verify: Shipment-level reconciliation, exception escalation and authorized quality review
Illustrative study-planning model only, not a BIOTRANS-approved SOP or proof of depot ownership, laboratory contracts, repository capability, carrier qualification, sample export approval or live integration. The sponsor, site and authorized QA must approve actual drug/sample flows. Do not include subject or patient identifiers in an enquiry.
Three transparent stages tailored to this service. They describe information exchange and human review, not a confirmed operation, quote or booking.
Share approved temperature profile, origin/destination, study supply category and authorized contacts; exclude patient identifiers.
Confirm drug release authority, packaging qualification, site receipt instructions and excursion decision ownership.
Receive a list of open feasibility questions and documentation needs; a transport commitment requires separate operator approval.
No patient records, study identifiers or regulated source documents should be entered in the public enquiry. Actual scope, credentials, temperature controls and legal requirements are verified separately.
Prepare this service enquiryPractical points for project planning; final acceptance depends on verified shipment specifics.
Confirm the study protocol, authorized shipper and consignee, approved temperature band, shipment release requirements and site handover records before a route is accepted.
The project should specify escalation contacts, calibrated monitoring evidence, quarantine and disposition authority in advance; the logistics provider must not decide drug usability independently.
Downloads a fixed, contact-free planning checklist in your chosen language. No form data, patient details or request is sent. Requires JavaScript. This is not a permit, verified capacity statement or confirmed booking.

Sample-specific planning for research materials with defined packaging, routing and handling requirements.
Explore service ↗
Connecting China-side execution with international shipping, documentation and qualified local partners, subject to project-specific feasibility.
Explore service ↗
Assess study-supply storage and depot handovers for China-connected projects. This is a planning and partner-qualification discussion, not a claim that BIOTRANS owns or operates any specific depot.
Explore service ↗
Discuss cryogenic transport feasibility for sensitive research materials, including qualified containers, dry-shippers, replenishment, documentation and specialist partner selection. Equipment availability and capability are not confirmed by this page.
Explore service ↗
Selection and preparation of temperature-control packaging based on payload, route, duration and qualified system availability.
Explore service ↗